Aerodyne AtSite signed 2 years inspection contract with ScottishPower Renewables

We are pleased to announce that last week, Aerodyne AtSite A/S has finalized the signing of a 2 years contract with ScottishPower Renewables for their 1147 wind turbine UK portfolio.  

ScottishPower Renewables is part of the Iberdrola Group, a world leader in clean energy with an installed capacity of over 28,000 MW, and the leading wind energy producer worldwide.

The agreement between the two companies includes drone inspections, data handling, analysis and asset management web platform of blades for onshore turbines. By using drones and AI driven software Aerodyne AtSite and Scottish Power expect to improve operations and blade repair campaigns significantly. Turbines are paused in less than 30 minutes for the data capture, meaning that loss of production are kept to a minimum.

All inspection data will be handled via our AI-driven VertikalitiWIND web platform for improvements of repair strategies by prioritizing and better reporting.